Complete Pump Assembly - PROCESSTEC ViscoTwin 130 G8 Operation & Maintenance Manual

Table of Contents

Advertisement

4.4.3 Complete Pump Assembly

To assemble the pump, follow each of the steps outlined in this subsection.
Required Tools:
• Small 7mm Wrench
• 5mm Socket Hex Nut
• 8mm Socket Hex Nut
• 10mm Socket Hex Nut
• 30mm Socket Hex Nut
• 30mm Spindle Screw
• Torque Wrench - Small
• Torque Wrench - Large
Action steps for complete pump disassembly:
STEP 1)
Removing the Protection Shields
STEP 2)
Installing both seals into the Seal Housing
STEP 3)
Installing Seal Housing into Bearing Housing
STEP 4)
Reseating the Mechanical Seals
STEP 5)
Reinstalling the Protection Shields
STEP 6)
Installing both Spindles
STEP 7)
Fixating the Spindles
STEP 8)
Removal of Shaft Blocking Tool
STEP 9)
Reinstall the Lantern Safety Guard
STEP 10)
Verify that Spindles Spin Freely
STEP 11)
Check gapping of Spindles
STEP 12)
Tighten Hex Screws
STEP 13)
Install Pump Housing
STEP 14)
Installing Pump Face to Pump Housing
PROCESSTEC INC. 2022
(for Pos. 2532)
(for Pos. 2259)
(for Pos. 3002)
(for Pos. 2533)
(for Pos. 1016 & 2527)
(for Pos. 2180)
(1/4" Drive, Capable of Torque ranging from 8 to 15 Nm)
(1/2" Drive, Capable of Torque up to 150 Nm)
4. MAINTENANCE
Page 57

Advertisement

Table of Contents
loading

Table of Contents