Kemppi ArcValidator Operating Manual page 5

Table of Contents

Advertisement

ArcValidator L 650 load bank
ArcValidator L 650 load bank simulates the welding arc and determines whether the actual voltage, current and wire
feed speed of your welding equipment matches with the values shown (and set) on the meters. The load bank can val-
idate all kinds of welding machines up to 600 amperes current output.
As standard, the load bank is connected to the welding machine DIX connectors. Only the optimized cables delivered
with the ArcValidator equipment can be used. Using other cables may result in inaccurate verification readings.
ArcValidator RC is connected to the load bank using the connector cable provided with it.
1.
RC connection
2.
LED indicator (temperature warning)
3.
LED indicator (power on)
4.
Control cable connection (with advanced Kemppi equipment)
5.
Wire insertion/exit point for wire feed speed verification
6.
Verification cable (DIX) connection (+)
7.
Power ON/OFF switch (and 1.0A fuse)
8.
Verification cable (DIX) connection (-).
ArcValidator cables
Use the cables delivered with the equipment only.
1.
Automatic verification control cable:
© Kemppi
5
ArcValidator
Operating manual - EN
AVPCRC / 2224

Advertisement

Table of Contents
loading

Table of Contents