Checking Before Installation - Ruijie RG-MAP852-SF-M Hardware Installation And Reference Manual

Table of Contents

Advertisement

Hardware Installation and Reference Guide
3.2

Checking Before Installation

Carefully plan and arrange the installation location, networking mode, power supply, and
cabling before installing the device.
Confirm the following requirements before installation:
The installation location provides sufficient space for heat dissipation.
The installation location meets the temperature and humidity requirements of the
device.
The power supply and required current are available in the installation location.
The Ethernet cables have been deployed in the installation location.
The selected power supply meets the system power requirements.
The position of the indoor emergency power switch is found before installation, so that
the power switch can be cut off in case of accidents.
For a ceiling-mounted or wall-mounted AP, the mounting bracket dimensions and
mounting hole pattern should meet the requirements. The following figure shows the
mounting bracket dimensions.
21
Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-MAP852-SF-M and is the answer not in the manual?

Table of Contents