regulations, improving the system reliability. IQ Relay automatically reconnects when valid
grid conditions resume and must be installed on all sites to improve the system reliability.
o
All Enphase systems (single-phase and three-phase) shall need to mandatorily install IQ Relay
to benefit from our limited microinverter warranty. (Effective for systems activated on or after
September 01, 2022) You can find the Enphase Limited Warranty for India at
https:/ /enphase.com/warranty/india
Tie wraps.
IQ Sealing Caps (Q-SEAL-10) for any unused drops on the IQ Cable (optional).
IQ Terminator (Q-TERM-10). One for each AC cable segment end; typically, two IQ Terminators
(center feeding branch circuit) are required per branch circuit.
IQ Disconnect Tool (Q-DISC-10).
IQ Cable.
Enphase Installer App.
Download the Enphase Installer App and open it to log in to your Enphase Account. With this mobile
app, you can scan microinverter serial numbers and connect to the IQ
system installation progress. To download, go to
Cable model
Q-12-10-240
Q-12-20-200

Other tools

The other tools are:
Screwdrivers (#1 and #3)
Wire cutters, voltmeter
Torque wrench, sockets, and wrenches for mounting hardware

Enphase microinverter installation

Installing the Enphase IQ Series Microinverters involves several key steps. Each step listed here is detailed on
the following pages:
Step 1: Position the IQ Cable
Step 2: Position the junction box
Step 3: Mount the microinverters
Step 4: Create an installation map
Step 5: Manage the cabling
Step 6: Connect the microinverters
Step 7: Terminate the unused end of the cable
Step 8: Complete the installation of the junction box
Step 9: Connect the PV modules
Step 10: Energize the system
13
Connector spacing
PV module orientation
1.3 m
Portrait
2.3 m
Landscape (72-cell)
© 2023 Enphase Energy Inc. All rights reserved.
IQ7+ and IQ7A Installation and Operation Manual - India
enphase.com/toolkit
Metered to track
Gateway
or scan the QR code at right.
Connector count per
box
240
200
August 2023
USM-00002-1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq7a

Table of Contents