Step 11: Set up and activate monitoring
Refer to the
Enphase IQ
system monitoring and grid management functions. This guide leads you through the following:
•
Connecting the IQ
•
Detect devices
•
Connecting to the Enphase App
•
Registering the system
•
Building the virtual array
NOTE: When the utility requires a profile other than the profile resident on the microinverter, you
must select an appropriate grid profile for your installation. You can set the grid profile through the
Enphase App, during system registration, or through the Enphase Installer App at any time. You must
have an Enphase IQ Gateway to set or change the grid profile. For more information on setting or
changing the grid profile, refer to the Enphase IQ Gateway Metered Installation and Operation
Manual at enphase.com/support.
Troubleshooting
Follow all the safety measures described throughout this manual. Qualified personnel can use the following
troubleshooting steps if the PV system does not operate correctly.
WARNING: Risk of electric shock. Do not attempt to repair the Enphase microinverter; it contains no
user-serviceable parts. If it fails, contact Enphase customer service to obtain a return merchandise
authorization (RMA) number and start the replacement process.
Status LED indications and error reporting
The following section describes LED indications.
LED operation
LED color
Flashing green
Flashing orange
Flashing red
Solid red
The status LED on each microinverter lights green about six seconds after DC power is applied. It remains lit
solid for two minutes, followed by six green blinks. After that, red blinks indicate that no grid is present if the
system is not yet energized.
Any short red blinks after DC power is first applied to the microinverter indicate a failure during microinverter
startup.
19
Metered Quick Install Guide
Gateway
Gateway
Indicates
Normal operation. The AC grid function is normal; there is communication with
the IQ Gateway Metered.
The AC grid is normal, but there is no communication with the IQ Gateway
Metered.
The AC grid is either not present or not within specification.
There is an active "DC Resistance Low - Power Off" condition. To reset, see the
DC Resistance Low – Power Off