Step 11: Set up and activate monitoring

Step 1: Position the IQ Cable

A. Plan each cable segment to allow drop connectors on the IQ Cable to align with each PV module.
Allow extra length for slack, cable turns, and any obstructions.
B. Mark the approximate centers of each PV module on the PV racking.
C. Lay out the cabling along the installed rack for the AC branch circuit.
D. Cut each segment of cable to meet your planned needs.
WARNING: When transitioning between rows, secure the cable to the rail to prevent cable or
connector damage. Do not count on the connector to withstand tension.

Step 2: Position the junction box

A. Verify that the AC voltage at the site is within range.
Single-phase system
L1 to N
B. Install a junction box at a suitable location on the racking.
C. Provide an AC connection from the junction box back to the electricity network using equipment
and practices as required by local jurisdictions.

Step 3: Mount the microinverters

A. If the Enphase DC bulkhead connectors are not already attached to the microinverters, attach them
now. Make sure they are fully seated.
B. Mount the microinverter bracket side up (as shown) and under the PV module, away from rain and
sun. Allow a minimum of 1.9 cm between the roof and the microinverter. Also, allow 1.3 cm between
the back of the PV module and the top of the microinverter.
14
IQ7+ and IQ7A Installation and Operation Manual - India
184 to 276 VAC
© 2023 Enphase Energy Inc. All rights reserved.
Three-phase system
L1, L2, L3 to N
184 to 276 VAC*
August 2023
USM-00002-1.0