Maintenance, Care And Disposal; General; Maintenance Work, Intervals; Daily Maintenance Tasks - EWM Phoenix 301 Progress puls Operating Instructions Manual

Table of Contents

Advertisement

6

Maintenance, care and disposal

Risk of injury from electric shock!
Cleaning machines that are not disconnected from the mains can lead to serious
injuries!
Disconnect the machine completely from the mains.
Remove the mains plug!
Wait for 4 minutes until the capacitors have discharged!
6.1

General

When used in the specified environmental conditions and under normal operating conditions, this
machine is largely maintenance-free and requires a minimum of care.
There are some points, which should be observed, to guarantee fault-free operation of your welding
machine. Among these are regular cleaning and checking as described below, depending on the pollution
level of the environment and the length of time the unit is in use.
6.2

Maintenance work, intervals

6.2.1

Daily maintenance tasks

Mains supply lead and its strain relief
Welding current cables (check that they are fitted correctly and secured)
Gas tubes and their switching equipment (solenoid valve)
Gas cylinder securing elements
Operating, message, safety and adjustment devices (Functional test)
Other, general condition
6.2.2

Monthly maintenance tasks

Casing damage (front, rear and side walls)
Transport rollers and their securing elements
Transport elements (strap, lifting lugs, handle)
Selector switches, command devices, emergency stop devices, voltage reducing devices, message
and control lamps
Check coolant tubes and their connections for impurities
Check that the wire guide elements (inlet nipple, wire guide tube) are fitted securely.
6.2.3

Annual test (inspection and testing during operation)

The welding machine may only be tested by competent, capable personsl.
A capable person is one who, because of his training, knowledge and experience, is
able to recognise the dangers that can occur while testing welding power sources as
well as possible subsequent damage and who is able to implement the required safety
procedures.
For further information, please see the accompanying supplementary sheets "Machine
and Company Data, Maintenance and Testing, Warranty"!
The former term of repetition test has been replaced due to a change in the corresponding standard with
"Inspection and testing during operation".
In addition to the regulations on the test given here, the relevant local laws and regulations must also be
observed.
099-005023-EW501
09.08.2010
Maintenance, care and disposal
DANGER
NOTE
General
91

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Phoenix 301 Progress puls and is the answer not in the manual?

Questions and answers

Table of Contents