GE LOGIQ 5 Service Manual page 199

Hide thumbs Also See for LOGIQ 5:
Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2300000, R
IRECTION
EVISION
8-3-1-4
Removal procedure (cont'd)
3.) Remove 3Connectors (CN1 - CN3) from the Monitor. Refer to Figure 8-2.
CN1
CN2
4.) Lift the Monitor Assy upward. Refer to Figure 8-3.
5.) Remove the Monitor Cover set. Refer to
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-2
Service Manual
Section 4-3-1
Section 4-3-2
Section 4-6-1
Section 10-5-2
8-3-1-5
Mounting procedure
Install the new parts in the reverse order of removal.
2
Figure 8-2 Disconnect three(3) connectors
1
Figure 8-3 Lifting the Monitor Assy Upward
Functional Tests
Section
Functional Test / Diagnostic Test
CRT Assy function check procedure
Functional Checks (See Also Chapter 4)
Chapter 8 Replacement Procedures
CN1
CN2
CN3
8-3-3 "Monitor Cover Set" on page
Power On/Boot Up
Power Off / Shutdown
LOGIQ™5 S
ERVICE
CN3
8-7.
Debrief Script
"Service Manual, Direction
2300000, Rev 1+, Section 8-3-1. Equipment
passed all required tests and is ready for use. "
M
ANUAL
8-3

Advertisement

Table of Contents
loading

Table of Contents