GE LOGIQ 5 Service Manual page 119

Hide thumbs Also See for LOGIQ 5:
Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2300000, R
IRECTION
EVISION
4-9-8
Backplane Assy function check procedure
1.) Turn on the system and check the completion of Echoloader loading.
2.) Check the system basic functions. Refer to Section 4-3-4 - System B/M-Mode Checks on page 4-
7. Refer to Section 4-3-5 - System CFM and PWD Checks on page 4-9.
4-9-9
SIG Assy function check procedure
1.) Turn on the system and check the completion of Echoloader loading.
2.) Check the system basic functions. Refer to Section 4-3-4 - System B/M-Mode Checks on page 4-
7. Refer to Section 4-3-5 - System CFM and PWD Checks on page 4-9.
4-9-10
DC FAN Assy function check procedure
1.) After replace DC FAN Assy, turn on the system. Refer to Section 3-5-1 - Power On/Boot Up on page
3-11.
2.) Check the FAN rotating with naked eye and check the FAN operating by rotating sound. No strange
sound should be heard.
NOTE:
Do not close the EMI BRKT and right plastic cover before check the FAN operation.
2
Figure 4-48 Check DC FAN rotating
Chapter 4 Functional Checks
LOGIQ™5 S
M
ERVICE
ANUAL
4-47

Advertisement

Table of Contents
loading

Table of Contents