Chapter 9: Building Stacks with SFP+ Ports S1 and S2
120
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
3. Wait one minute for the switch to start the AlliedWare Plus
management software.
The switch displays the number 1 on its ID LED and is now the master
switch.
4. Power on the switch to be assigned ID number 2.
5. Wait two minutes for the new switch to join the stack as a member.
The new switch automatically boots up twice before joining the stack
as a new member, once with the default ID number 1 and again with
the next available number, which is 2.
6. If there is a third switch, power it on and wait two minutes for it to join
the stack as a member with the ID number 3.
7. Repeat step 6 until all the switches are powered on.
The stack is now operational. The switches retain their ID numbers
even when reset or powered off.
8. To continue with the installation, go to "Verifying the Stack and
Assigning Priority Numbers" on page 123.