2.3

Main power switch ED, FD, FED 720

The chambers ED, FD, FED size 720 are equipped with a main power switch located on the chamber
rear.
3.
Completeness of delivery, transportation, storage, and installa-
tion
3.1

Unpacking, and checking equipment and completeness of delivery

After unpacking, please check the chamber and its optional accessories, if any, based on the delivery
receipt for completeness and for transportation damage. Inform the carrier immediately if transportation
damage has occurred.
The final tests of the manufacturer may have caused traces of the racks on the inner surfaces. This has
no impact on the function and performance of the chamber.
Please remove any transportation protection devices and adhesives in/on the chamber and on the doors
and take out the operating manuals and accessory equipment.
If you need to return the chamber, please use the original packing and observe the guidelines for safe
lifting and transportation (chap. 3.2).
For disposal of the transport packing, see chap. 14.1.
Note on second-hand chambers (Ex-Demo-Units):
Second-hand chambers are chambers that have been used for a short time for tests or exhibitions. They
are thoroughly tested before resale. BINDER ensures that the chamber is technically sound and will work
flawlessly.
Second-hand chambers are marked with a sticker on the chamber door. Please remove the sticker before
commissioning the chamber.
BD / BF / ED / FD / FED (E3.1) 03/2019
Off
Figure 7: Main power switch on the chamber rear
Sliding or tilting of the chamber.
Damage to the chamber.
Risk of injury by lifting heavy loads.
∅ Do NOT lift or transport the chamber using the door handle or the door.
∅ Do NOT lift chambers size 720 by hand
 Lift the chamber size 56 and 115 from the pallet at its four lower corners
with the aid of 2 people, chamber size 260 with the aid of 4 people.
 Lift chambers size 720 from the pallet using technical devices (fork lifter).
Set the fork lifter only from the rear in the middle of the chamber. Make
sure to place all the lateral supports of the chamber on the forks.
On