Dürkopp Adler 513 Operating Instructions Manual page 23

Table of Contents

Advertisement

Operation
Operating Instructions 513/533 - 01.0 - 09/2023
Inserting a full bobbin
To insert the full bobbin:
1.
Insert the full bobbin into the bobbin case upper section (2).
2.
Feed the hook thread through the bobbin case slot (7) under
the tensioning spring (5) into the hole (4).
3.
Pull the hook thread approx. 2.5 cm out of the bobbin case (2).
 The bobbin must rotate in the direction of the arrow when
pulling out the hook thread.
4.
Insert the bobbin case (2).
5.
Close the hook cover (3).
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

533

Table of Contents