Commissioning
Fig. 47: PLC Control logged in, ready for program startup
The PLC can now be started via "Online" → "Run", F5 key or
.
5.1.2

TwinCAT 3

Startup
TwinCAT 3 makes the development environment areas available all together, with Microsoft Visual Studio:
after startup, the project folder explorer appears on the left in the general window area (see "TwinCAT
System Manager" of TwinCAT 2) for communication with the electromechanical components.
After successful installation of the TwinCAT system on the PC to be used for development, TwinCAT 3
(shell) displays the following user interface after startup: