Beckhoff EL3692 Manual page 164

2 channel resistance measurement terminal, high-precision
Hide thumbs Also See for EL3692:
Table of Contents

Advertisement

Commissioning
• In TwinCAT PLC, under the "Project" menu, select "Rebuild all" to compile the project (Fig. Compile
project)
Fig. 168: Compile project
• In TwinCAT PLC: log in with the "F11" button, confirm loading the program (Fig. Confirming program
start), run the program with the "F5" button
Fig. 169: Confirming program start
164
Version: 3.1
EL3692

Advertisement

Table of Contents
loading

Table of Contents