ZXA10 C300 Cabinet Installation Guide (19 Inch)
Caution!
Marking and drilling are important for hardware installation. Improper marking and drilling
may cause much inconvenience in the future work. The quality of marking and drilling is
the prerequisite to the whole project.
3.3.3 Installing Expansion Bolt
The following steps are required for installing an expansion bolt:
1. Clean the holes with a cleaner.
2. Measure the space between holes. Reposition and re-drill the holes, which are largely
deviated from the requirements.
3. Put the expansion bolt and expansion tube into the hole vertically.
4. Strike the expansion bolt with a rubber hammer until the expansion tube enters the
ground completely.
3.3.4 Fixing Cabinet
The following steps are required for fixing a cabinet on the cement floor:
1. Move the cabinet and put the four installation feet on the bottom of the cabinet into the
holes drilled on the ground, as shown in
SJ-20110909101511-005|2011-12-31 (R1.1)
Figure
3-13.
3-12
ZTE Proprietary and Confidential