Figure 2-2 Packing Box - Zte ZXA10 C300 Installation Manual

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

ZXA10 C300 Cabinet Installation Guide (19 Inch)
2. Unpack the cabinet box.
l
Be cautious while unpacking. Protect the equipment coating and the circuit
boards.
l
When the equipment arrives at the destination with a considerably different
temperature and humidity, do not open the package until it stays for some time
in order to avoid damage to the equipment.
l
Unpack carefully and check the items one by one. Make sure that the goods are
consistent with the contract, shipping list, and packing list. Make sure that the
component list and technical documents are in No.1 packing box.
a. Unpack No.1 packing box and check whether the attached documents and
unpacking inspection report are available. The installation staff must go through
the technical documents and check the lists. Make detailed inspection and record
if any damage of the interior packing is found.
b. The cabinet is packed in a wooden box, as shown in
wrapped with aluminum foil and the edges are protected with cushions fixed with
adhesive tape, as shown in

Figure 2-2 Packing Box

1. Cover
SJ-20110909101511-005|2011-12-31 (R1.1)
Caution!
Figure
2-3.
2. Body
2-8
ZTE Proprietary and Confidential
Figure
2-2. The cabinet is

Advertisement

Table of Contents
loading

Table of Contents