Zte ZXA10 C300 Installation Manual page 101

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

l
For the protection grounding cable and working grounding cable of DC distribution
cabinet equipped with Level C lightning protection device, use a multi-copper wire (≥
35 mm
l
Connect the cables mentioned above to the protection grounding bar in the equipment
room. Try to keep the length of the grounding cable as short as possible.
SJ-20110909101511-005|2011-12-31 (R1.1)
2
).
Appendix C Lightning Proof Network
C-3
ZTE Proprietary and Confidential

Advertisement

Table of Contents
loading

Table of Contents