Unpacking Shelf; Figure 2-4 Shelf Packing Box - Zte ZXA10 C300 Installation Manual

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

ZXA10 C300 Cabinet Installation Guide (19 Inch)
installation accessories, and reliability should be checked carefully. Close the
cabinet door when completing the cabinet inspection.
– End of Steps –
Result
The cabinet is successfully unpacked.

2.5.2 Unpacking Shelf

Perform this procedure to unpack the shelf.
Context
The shelf for expansion is packed separately in a box.
box.

Figure 2-4 Shelf Packing Box

1. Cover
To unpack the shelf, perform the following steps:
Steps
1. Place the packed unit on ground and keep its face upwards.
2. Use a nail hammer to remove nails and corner wrap sheets.
3. Remove the top cover of the packing box.
– End of Steps –
SJ-20110909101511-005|2011-12-31 (R1.1)
2. Box
2-10
Figure 2-4
shows the shelf packing
ZTE Proprietary and Confidential

Advertisement

Table of Contents
loading

Table of Contents