Zte ZXA10 C300 Installation Manual page 8

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

Chapter
Chapter 3, Cabinet Installation
Chapter 4, Power Supply Installation
Chapter 5, Cable Connection
Chapter 6, Installation Check
Appendix A, Indoor Cabinet Grounding System
Connection
Appendix B, Grounding Network Requirements
Appendix C, Lighting Proof Network
Conventions
ZTE documents employ the following typographical conventions.
Typeface
Meaning
Italics
References to other Manuals and documents.
"Quotes"
Links on screens.
Bold
Menus, menu options, function names, input fields, radio button names, check
boxes, drop-down lists, dialog box names, window names.
CAPS
Keys on the keyboard and buttons on screens and company name.
Note: Provides additional information about a certain topic.
Checkpoint: Indicates that a particular step needs to be checked before
proceeding further.
Tip: Indicates a suggestion or hint to make things easier or more productive
for the reader.
Mouse operation conventions are listed as follows:
Summary
Describes the cabinet installation flow, cabinet
installation, decorative panel installation, shelf
installation, card installation, and fan tray
installation.
Describes the power cable and grounding cable
installation flow, cable details, and fan tray power
supply system.
Describes the overall cabling, cabling principles,
maintenance cables, and optical fiber layout.
Describes the overall inspection, power supply
inspection, and power-ON/OFF inspection.
Describes the grounding for rack system in central
equipment room and remote equipment room.
Describes the grounding requirements for the
access network, grounding cable requirements,
grounding connection requirements, grounding
resistance requirements, ingress and egress
communication office (station) cable requirements.
Describes the lightning protection requirements and
lightening protection design.
II

Advertisement

Table of Contents
loading

Table of Contents