Chapter 2 Pre-Installation Preparation; Installation Preparation Flow - Zte ZXA10 C300 Installation Manual

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

Chapter 2
Pre-Installation Preparation
Table of Contents

Installation Preparation Flow ......................................................................................2-1

Engineering Documents Preparation ..........................................................................2-2
Tools and Meters........................................................................................................2-3
Installation Environment Check ..................................................................................2-4
Unpacking ..................................................................................................................2-7
2.1 Installation Preparation Flow
Figure 2-1
shows the installation preparation flow.
2-1
SJ-20110909101511-005|2011-12-31 (R1.1)
ZTE Proprietary and Confidential

Advertisement

Table of Contents
loading

Table of Contents