Smog Monitoring Cable; Figure 5-10 Entrance Control Monitoring Cable Structure; Table 5-3 Entrance Control Monitoring Cable Pin Connections - Zte ZXA10 C300 Installation Manual

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

ZXA10 C300 Cabinet Installation Guide (19 Inch)

Figure 5-10 Entrance Control Monitoring Cable Structure

Pin Connection
Table 5-3

Table 5-3 Entrance Control Monitoring Cable Pin Connections

Pin No. at End A
1
4

5.4.2 Smog Monitoring Cable

Cable Structure
Figure 5-11
SJ-20110909101511-005|2011-12-31 (R1.1)
lists the door control monitoring cable pin connections.
Pin No. at End B
1
2
shows the smog monitoring cable structure.
5-12
ZTE Proprietary and Confidential
Signal Description
Switch A
Switch B

Advertisement

Table of Contents
loading

Table of Contents