Adjacent Cabinets Connection; Figure 3-18 Fixing Multiple Cabinets In Parallel - Zte ZXA10 C300 Installation Manual

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

ZXA10 C300 Cabinet Installation Guide (19 Inch)

Figure 3-18 Fixing Multiple Cabinets In Parallel

1. Inner wall
2. Cabinet edge

3.4.3 Adjacent Cabinets Connection

When two or more than two cabinets are placed one by one, it is necessary to connect
them on the top, as shown in
SJ-20110909101511-005|2011-12-31 (R1.1)
3. Holes drilled on the ground
4. Cabinet edge
Figure
3-19.
3-18
ZTE Proprietary and Confidential

Advertisement

Table of Contents
loading

Table of Contents