ZXA10 C300 Cabinet Installation Guide (19 Inch)
Figure 2-1 Installation Preparation Flow
2.2 Engineering Documents Preparation
The following documents are related to ZXA10 C300:
l
Purchase contract (duplicate copy) and technical proposals.
l
Engineering survey report, environment acceptance report, and installation
acceptance report.
l
ZXA10 C300 (V1.2) EPON/10G EPON Optical Access Convergence Equipment
Hardware Installation Manual
SJ-20110909101511-005|2011-12-31 (R1.1)
2-2
ZTE Proprietary and Confidential