ZXA10 C300 Cabinet Installation Guide (19 Inch)

Figure 3-11 Foot Installation Flowchart

3.3.2 Positioning Cabinet

Two steps are required for positioning the cabinet.
1. Marking
a. Confirm the position for installing the cabinet according to the reference
dimensions and base dimensions given in the engineering design diagram.
b. Use a measuring tape to measure the position.
c. Use an ink marker to mark the position.
Figure 3-12
SJ-20110909101511-005|2011-12-31 (R1.1)
shows the drilling diagram.