Figure 3-17 Fixing Two Cabinets In Parallel - Zte ZXA10 C300 Installation Manual

Optical access convergence equipment
Hide thumbs Also See for ZXA10 C300:
Table of Contents

Advertisement

Figure 3-17 Fixing Two Cabinets In Parallel

1. Inner wall
2. Cabinet edge
Fixing Multiple Cabinets
Fix multiple cabinets in parallel, as shown in
SJ-20110909101511-005|2011-12-31 (R1.1)
3. Holes drilled on the ground
4. Cabinet edge
Figure
3-18.
3-17
Chapter 3 Cabinet Installation
ZTE Proprietary and Confidential

Advertisement

Table of Contents
loading

Table of Contents