ZXA10 C300 Cabinet Installation Guide (19 Inch)
Figure 2-6 Opened Card Packing Box
1. Card pad
3. Count the cards.
4. Wear the antistatic wrist straps and take the card from the antistatic bag. Conform the
card type.
5. Check connectors, fiber tails, and accessories according to specifications and
requirements.
6. Check the cable type, length, and cable connector.
– End of Steps –
Result
The cards are unpacked successfully.
Follow-Up Action
Fill in the acceptance list and the acceptance report. Both parties should sign it for
confirmation and each party should keep a copy.
Contact the local ZTE office, if anything is found damaged, wrong, or missing during the
unpacking inspection.
SJ-20110909101511-005|2011-12-31 (R1.1)
2. Carton
2-12
ZTE Proprietary and Confidential