11 SERVICE WORK ON THE CHASSIS
54
–
2
Tighten screw
Guideline
Screw, top steering
head
W00184-10
–
Mount and tighten screw
Guideline
Screw, top steer-
ing stem
W00184-11
–
Using a plastic hammer, tap lightly on the upper triple clamp to
avoid stresses.
–
Tighten screws
Guideline
Screw, top triple clamp
–
Secure the wiring harness with cable holder on the left. Mount and
7
tighten screw
F03664-11
–
Position the brake caliper. Mount and tighten screws
Guideline
Screw, front
brake caliper
–
Position the brake line and the clamp. Mount and tighten
9
screws
.
W00220-12
Finishing work
–
Install front fender. (
–
Mount the handlebar cushion.
–
Install the start number plate. (
–
Install the front wheel.
–
Check that the wiring harness, throttle cables, and brake and clutch
lines can move freely and are routed correctly.
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
.
M20x1.5
12 Nm (8.9 lbf ft)
5
.
M8
20 Nm (14.8 lbf ft)
6
.
M8
17 Nm (12.5 lbf ft)
.
M8
25 Nm (18.4 lbf ft)
p. 57)
p. 56)
(
p. 93)
p. 55)
Loctite
®
243™
8
.
Loctite
®
243™
p. 47)