YASKAWA FP605 Installation & Primary Operation page 47

Ac drive for industrial fan and pump applications
Hide thumbs Also See for FP605:
Table of Contents

Advertisement

3.
Remove the terminal block nuts.
A - Nut
4.
Put the ends of wires with closed-loop crimp terminals on the main circuit terminal block studs.
5.
Tighten the nuts to the specified torque.
6.
Check the signal from the wired terminal and use a diagonal-cutting pliers to remove areas of the wiring cover
cutaway section.
Cut the correct areas shown in
YASKAWA TOEPC7106171FD FP605 DRIVE INSTALLATION & PRIMARY OPERATION
Figure 7.19 Remove the Terminal Block Nuts
Figure 7.20 Install the Electrical Wires
Figure 7.21 Tighten the Terminal Block Nuts
Figure 7.22
for your wire gauges.
7 Electrical Installation
47