YASKAWA FP605 Installation & Primary Operation page 45

Ac drive for industrial fan and pump applications
Hide thumbs Also See for FP605:
Table of Contents

Advertisement

4.
Use a file to make the rough surface of the knock-out hole edge smooth.
5.
Put the conduit bracket in its initial position.
6.
Remove the terminal block bolt.
A - Bolt
7.
Put the ends of wires with closed-loop crimp terminals through the conduits.
Note:
Install the included rubber grommets or use conduits to keep the IP20 protection level and to prevent damage to the wires. To
comply with UL standards, you must use conduits for wiring.
YASKAWA TOEPC7106171FD FP605 DRIVE INSTALLATION & PRIMARY OPERATION
Figure 7.14 Reattach the Conduit Bracket
Figure 7.15 Remove the Terminal Block Bolts
7 Electrical Installation
45

Advertisement

Table of Contents
loading

Table of Contents