YASKAWA FP605 Installation & Primary Operation page 43

Ac drive for industrial fan and pump applications
Hide thumbs Also See for FP605:
Table of Contents

Advertisement

5.
Put the conduit bracket in its initial position.
6.
Remove the terminal block bolt.
A - Bolt
7.
Put the ends of wires with closed-loop crimp terminals through the conduits.
Note:
• When you use terminals - and +1 and these terminals have covers, remove them to install the wire.
• Install the included rubber grommets or use conduits to keep the IP20 protection level and to prevent damage to the wires. To
comply with UL standards, you must use conduits for wiring.
8.
Align the closed-loop crimp terminals with the bolt holes on main circuit terminal block.
YASKAWA TOEPC7106171FD FP605 DRIVE INSTALLATION & PRIMARY OPERATION
Figure 7.9 Reattach the Conduit Bracket
Figure 7.10 Remove the Terminal Block Bolts
Figure 7.11 Install the Electrical Wires
7 Electrical Installation
43