Maintenance/Inspection; Checking The Cable Bundle; Checking The Earth Conductor - KSB Amacan P 500-270 Installation & Operating Manual

Submersible pump in discharge tube
Hide thumbs Also See for Amacan P 500-270:
Table of Contents

Advertisement

50 of 112
7 Servicing/Maintenance
WARNING
Insufficient stability
Risk of crushing hands and feet!
▷ During assembly/dismantling, secure the pump (set)/pump parts to prevent
tilting or tipping over.
WARNING
Corrosion on the pump set
Risk of injury from solid matter in the fluid handled!
▷ If persons come into contact with the fluid handled during pump operation
(e.g. in sports facilities and leisure parks), check the pump set for corrosion
regularly and adhere to the maintenance interval specified.
NOTE
Special regulations apply to repair work on explosion-proof pump sets.
Modification or alteration of the pump set may affect explosion protection and are
only permitted after consultation with the manufacturer.
A regular maintenance schedule will help avoid expensive repairs and contribute to
trouble-free, reliable operation of the pump, pump set and pump parts with a
minimum of servicing/maintenance expenditure and work.
NOTE
All maintenance work, service work and installation work can be carried out by KSB
Service or authorised workshops. Find your contact in the attached Addresses
booklet or visit https://www.ksb.com/en-global/contact.
Never use force when dismantling and reassembling the pump set.

7.2 Maintenance/inspection

KSB recommends the following regular maintenance schedule:
Table 8: Overview of maintenance work
Maintenance interval
Maintenance work
First check after at least
Visually inspecting for
6 months; interval can
corrosion
be extended to 12
months (in sports
facilities and leisure
parks)
Every 4000 hours, at
Measuring the insulation
least once a year
resistance
Every 8000 hours, at

Checking the cable bundle

least every 3 years
Checking the earth
conductor
Checking the sensors
Checking the mechanical
seal leakage
Changing the lubricant
Every 16,000 hours, at
Lubricating the rolling
least every 5 years
element bearings
General overhaul
Amacan P
For details see ...
(ð Section 7.3.6, Page 56)
(ð Section 7.2.1.1, Page 51)
(ð Section 7.3.3, Page 54)
(ð Section 7.3.4, Page 54)
(ð Section 7.2.1.2, Page 51)
(ð Section 7.3.5, Page 55)
(ð Section 7.4.1.4, Page 57)
(ð Section 7.4.2.1, Page 58)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amacan p 600-350

Table of Contents