SAfETy INfORmATION
Specific safety instructions
20
①
Light curtains
The light curtain at the bundle respectively rack loader unit impedes move-
ments within the reach of the lifting and the spot-drilling unit subsequent to
interruption of the light curtain. The collet chuck of the spot-drilling unit can
carry out a rapid retracting motion. The motions for bar guidance and bar feed
can continue so that continued production is guaranteed.
②
Mobile separating safety installations
These installations impede the access of the operator during ongoing mo-
tions. The mobile separating safety installations are equipped with a bolt
keeper for the safeguarding of running-out movements.
③
Safety switches of the channel interlock
These safety switches serve the enquiry of the channel interlock. Before
drum indexing or spindle rotation release, the channels must be locked.
④
Safety switches for channel aperture monitoring
These safety switches serve the monitoring of the channel aperture. Before
drum indexing or spindle rotation release, the channels must be locked.
Drum stroke
For service purposes, the drum may be pushed backward. The linked position
of the spindle is being enquired. If said position was not reached, any move-
ments at the bar loading magazine will be impeded.
Bar loading magazine MBL22‑8, MBL24‑6, MBL32‑6, MBL40‑6, MBL40‑8
INDEX Multi spindle turning machines Control system C200-sl
DIM063EN - 2021-09-27