Follow-up Procedure
●
●
3.2.14.2 Bottom Cable Routing
Context
Route cables for the UPS from inside out and from bottom up.
Procedure
Step 1 Open the front door of the bypass cabinet, and remove the covers of the power
distribution subrack from the bypass cabinet.
Step 2 Remove the cable covers from the bottom of the cabinet, drill holes in the covers,
attach grommet strips to the hole edges for protecting cables, and reinstall the
cable covers.
The hole diameter and quantity are for reference only.
Issue 05 (2020-04-27)
After connecting cables, reinstall the covers of the power distribution subrack,
rear panel, and side panel of the bypass cabinet.
After connecting cables, check that a certain clearance is reserved between
the internal switch (if any) extension pole and power cables to avoid friction.