Step 2 Tap Start on the right of Capacity Test to start a capacity test.
Figure 4-11 Starting a capacity test
----End

4.6.4 Test Data Download

Issue 05 (2020-04-27)
NO TE
The capacity test automatically stops in any of the following cases:
● The battery discharge voltage reaches the EOD voltage plus 0.01 V.
● The load fluctuation exceeds 10%.
● An alarm is generated.
When the battery discharge voltage reaches the EOD voltage plus 0.01 V, the test is
complete. The test data is obtained from the capacity test. Based on monthly capacity test
data, select the test data obtained from a capacity test that has the maximum discharge
capacity as the current-month test data. Save the test data obtained from the latest 36
tests.
WEB
a.
On the WebUI, choose Query > Operation Log, choose logs that need to
be queried from the Log drop-down list box, and click Query.
Figure 4-12 Operation Log
b.
Choose logs that have been queried from the Log drop-down list box,
and click Export.
Old WEB
a.
On the WebUI, choose Query > Logs, choose logs that need to be
exported from the Log drop-down list box, and click Query.