Figure 3-30 Hole dimensions (unit: mm)
Step 2 Drill holes and install expansion sleeves.
1.
2.
3.
4.
Figure 3-31 Drilling a hole and installing an expansion sleeve
(1) M12 bolt
(4) Expansion sleeve
----End
Combining Power Cabinets and Bypass Cabinets
The power cabinets and bypass cabinets are separately packed for delivery. Before
installing the UPS, combine the power cabinets and bypass cabinets. Before
combining the cabinets, ensure that the required fittings are complete.
lists the fittings.
Issue 05 (2020-04-27)
Drill a hole in the concrete floor using a hammer drill. The hole depth should
range from 52 mm to 60 mm.
Slightly tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Spring washer
(5) Expansion nut
3 Installation
(3) Flat washer
(6) Concrete floor
Table 3-15