Taylor PH61 Operator's Manual page 37

Heat treatment shake freezer
Hide thumbs Also See for PH61:
Table of Contents

Advertisement

9. Secure the pump parts in position by sliding the
retaining pin through the cross holes located at one
end of the pump cylinder. (See Figure 6-29.)
Figure 6-29
Note:
The head of the retaining pin should be located
at the top of the pump when installed.
10. Assemble the feed tube assembly. Slide the check
ring into the groove of the feed tube.
(See Figure 6-30.)
Figure 6-30
11. Install one red O-ring on each end of the mix feed
tube, and thoroughly lubricate. (See Figure 6-31.)
Operating Procedures
12. Lay the pump assembly, pump clip, feed tube, cotter
pin, and agitator in the bottom of the mix hopper for
sanitizing. (See Figure 6-32.)
13. Slide the large black O-ring and the two smaller black
O-rings into the grooves on the driveshaft.
Thoroughly lubricate the O-rings and shaft. Do not
lubricate the hex end of the shaft. (See Figure 6-33.)
Model PH61
OPERATING PROCEDURES
Figure 6-31
Figure 6-32
Figure 6-33
6
6-7

Advertisement

Table of Contents
loading

Table of Contents