For the electrician
19. Routing the cables for the proximity switches and
motors
CAUTION Material losses
The extra-low-voltage line (12 V AC) and low-voltage line (230 V AC) must be routed separately!
f Secure the cables with cable ties, making sure that the 12 V AC and 230 V AC lines are routed separately – Fig. 145.
For further details of plug connections, see also Fig. 29 on page 21 and Fig. 35 on page 23.
Fig. 145 Securing the cables with cable ties
Do not install the covers until all the cables have been properly connected and routed.
f Screw the cover over the strain reliefs using 3 self-tapping screws – Fig. 146.
f Hook on the cover for the frequency converters at the bottom and secure it at the top using 1 self-tapping screw –
Fig. 147.
f Tie the cables together using cable ties – Fig. 139.
Fig. 146 Cover over the strain reliefs
Fig. 148 Tying the cables together using cable ties
1
2
1 ........... 12 V AC (3 proximity switches LC 12V, GB 12V, AS 12V)
2 ........... 230 V AC (ash scraper and ember bed slide motor) GB 230V, AS 230V
3
3 ........... 230 V AC (stoker auger motor, Stok or RAS frequency converter)
3 x
Fig. 147 Cover over the frequency converters
1
1 ........... Cable tie