For the installer
13.5.7
Installing the InfoWIN Touch
f Connect the InfoWIN Touch connecting cable (Fig. 88) and insert InfoWIN Touch into the operating panel (with the
connection plug at the top) – Fig. 89.
f Insert the insulation into the operating panel – Fig. 90, Fig. 91.
1
Fig. 88
Connecting the InfoWIN Touch connecting cable and inserting
InfoWIN Touch into the operating panel (with the plug at the top)
1 ........... LAN connection
Fig. 90
Inserting the insulation into the operating panel
13.5.8
Installing the top cladding parts (only at PuroWIN PWPE 60)
f Put on the top cover plate at the front and secure it using 4 self-tapping screws – Fig. 93.
Fig. 92
Top cover plate
Fig. 93
Putting on the top cover plate at the front and securing it (only at PuroWIN PWPE 60)
Fig. 89
Inserting InfoWIN Touch into the operating panel
Fig. 91
Inserting the insulation into the operating panel – view from
above
1 ........... Insulationg
4 x
35
1