Windhager PUROWIN PWPE 60 Installation Instructions Manual page 41

Pellet boiler
Hide thumbs Also See for PUROWIN PWPE 60:
Table of Contents

Advertisement

For the installer
f Plug the 2 cables from control panel 5 of the hopper into the connection console – Fig. 111.
f For details of how to connect the RAS-TANK cable, see section 18 on page 53.
STOK
TANK
PE
Fig. 111 Connecting 2 cables from control panel 5 of the hopper
f Dispose of the transport foot and pallet properly; they are not longer needed.
f Screw the support foot to the retaining bracket on the stoker auger unit with 2 M10 hexagon nuts with flange and
gearing and M10x25 hexagon screws – Fig. 112.
Tip!
The support foot can also be fitted at the end.
f Install both covers on integral fuel hopper control panel 5 with 3 or 4 M5x10 self-threading TT Torx screws – Fig. 113.
Fig. 112 Installing the support foot
RAS S4
SRAS 230VAC
LC 12V
GB 230VAC
GB 12V
AS 230VAC
AS 12V
LON 12V
STW 12V
cabel RAS-Motor
2x
M10 M10 x 25
4x
Fig. 113 Installing both covers for control panel 5
41
FA2 230VAC
3x
M5 x 10
M5 x 10
LON 12V
TANK

Advertisement

Table of Contents
loading

This manual is also suitable for:

Purowin pwpe 75Purowin pwpe 90Purowin pwpe 100

Table of Contents