Windhager PUROWIN PWPE 60 Installation Instructions Manual page 28

Pellet boiler
Hide thumbs Also See for PUROWIN PWPE 60:
Table of Contents

Advertisement

For the installer
f According to the position of the flue connection (top or rear), punch out the relevant cut-out on the top part of the
cladding – Fig. 55.
Flue connection at top = punch out at the top
Flue connection at rear = punch out at rear
f Attach the top part of the cladding to the side panel on the right (Fig. 56) and secure it with 2 self-tapping screws at
the front (Fig. 57) and 2 self-tapping screws at the top (Fig. 58).
Fig. 55
Top part of the cladding for right side panel
Fig. 56
Attaching the top part of the cladding
Fig. 58
Securing the top part of the cladding at the top with 2 screws
1
2
Fig. 57
2 x
28
1 ........... Punch out this cut-out if the flue connection
is at the top
2 ........... Punch out this cut-out if the flue connection
is at the rear
Securing the top part of the cladding at the front with 2 screws
2 x

Advertisement

Table of Contents
loading

This manual is also suitable for:

Purowin pwpe 75Purowin pwpe 90Purowin pwpe 100

Table of Contents