For the installer
c) Lifting it off by crane using the eye
Alternatively, the boiler can also be lifted off the pallet by using the crane eye on the top of the boiler – Fig. 14.
f Remove the 4 self-tapping screws and the cover concealing the crane eye – Fig. 15.
Fig. 14
Removing the 4 self-tapping screws and cover concealing the
crane eye
13.2.2
Installing the immersion sleeve and sensor of the thermal discharge safeguard
f The immersion sleeve and sensor of the thermal discharge safeguard (accessory: FK-060) should be sealed and in-
stalled before you complete the set-up process and install the cladding. This is because the locations are easier to
access at this point.
However, you must not connect the thermal discharge safeguard until the rear panel has been installed – see Section
13.10 on page 45.
Fig. 16
Installing the immersion sleeve
13.2.3
Aligning the boiler horizontally
f Move the boiler into position (remember to observe the minimum clearances; see section 13.1 on page 14) and
use the adjustable feet to level the boiler.
1
Fig. 15
Crane eye
1 ........... Immersion sleeve