Windhager PUROWIN PWPE 60 Installation Instructions Manual page 24

Pellet boiler
Hide thumbs Also See for PUROWIN PWPE 60:
Table of Contents

Advertisement

For the installer
13.5.2
Installing the top connector
f Only at PuroWIN PWPE 60: Route the pre-assembled door safety switch to the top left-hand corner of the boiler and
push the grommet (already threaded onto the cable) into the opening – Fig. 38.
f Only at PuroWIN PWPE 75–100: Mount the door safety switch on the connector using 2 nuts. Please bear in mind
that you will need to adjust it after installing the cladding door – Fig. 39.
f Attach the top connector to the boiler using 2 U-washers and 2 M12pcs30 hexagon screws, but only screw them hand-
tight to begin with. Do not tighten them fully until all the cladding parts have been installed and the cladding has
been correctly adjusted (gap size) – Fig. 40.
f Fasten the top connector and left side panel using 2 or 3 self-tapping screws – Fig. 40.
f Only at PuroWIN PWPE 60: Mount the door safety switch on the top connector using 2 self-tapping screws. Please
bear in mind that you will need to adjust it after installing the cladding door – Fig. 40.
Fig. 37
Top connector (Illustration PuroWIN PWPE 60)
Fig. 38
Routing the door safety switch (only at PuroWIN PWPE 60)
PuroWIN
3 x
PWPE 60
PuroWIN
2 x
PWPE 75–100
2 x
1
Fig. 40
Installing the top connector and door safety switch (Illustration PuroWIN PWPE 60
1 ........... Door safety switch PuroWIN PWPE 60
Note!
f You must adjust the door contact switch after installing the cladding door.
Fig. 39
Installing the door contact switch (only at PuroWIN PWPE
75–100)
24
2 x
2 of each
M12x30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Purowin pwpe 75Purowin pwpe 90Purowin pwpe 100

Table of Contents