T3HVD Product Description
Attenuation / range switch
Bandwidth limit switch
Audible range overload
on / off switch
Output BNC
Operating Instructions
DUT measurement input leads: The integral input test leads extend 26cm from the probe body. Connect
●
the integral test leads directly to your DUT or use the extender leads and other accessories if necessary.
For best measurement signal integrity it is better not to extend the integral input test leads if possible. If
the extender leads are used then it is recommended to use the bandwidth limit.
If possible it is good practice to wind the DUT measurement input leads together to improve noise
●
immunity and give the best frequency response. If the extender leads are used then these should also be
twisted together if possible.
Page 7
Measurement voltage input leads
Maximum measurable differential voltage
Maximum input voltage to earth
Overload indicator
Attenuation / range Indicator
Bandwidth indicator
Audible range overload indicator