Additional Guidelines - REMEHA Gas 210 Ace 80 Installation And User Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 210 Ace 80:
Table of Contents

Advertisement

Diameter
(1)
Gas 210 Ace 160
Gas 210 Ace 200
(1) While maintaining the maximum length, additional 5 times 90° or 10 times 45° bends can be used (indicated for each boiler type and
diameter).
(2) With concentric roof terminal 150/220 mm.
Fig.13
Flue system length
L
A
L
B
Tab.16
Maximum length (L)
Diameter
(1)
Gas 210 Ace 80
Gas 210 Ace 120
Gas 210 Ace 160
Gas 210 Ace 200
(1) While maintaining the maximum length, additional 5 times 90° or 10 times 45° bends can be used (indicated for each boiler type and
diameter).
Fig.14
Bend radius ½D
R=½D
Fig.15
Bend radius 1D
R=1D
4.5.5

Additional guidelines

7837114 - v.01 - 10012023
100 mm
130 mm
-
15 m
-
6 m
Maximum flue lengths for C
L
Length from the terminal up to the air inlet connection.
A
L
Length from the flue gas connection up to the terminal.
B
Calculation: L = L
Important
The maximum permitted height difference between the air inlet
and the roof terminal is 36 m.
AD-3002013-01
150 mm
60 m
(1)
60 m
32 m
19 m
Reduction table
Tab.17
Pipe reduction for each bend - radius ½D (parallel)
Diameter
D
45° bend
90° bend
AD-3001608-01
Tab.18
Pipe reduction for each bend - radius 1D (parallel)
Diameter
D
45° bend
90° bend
AD-3001609-01
Installation
For installing the flue gas outlet and air supply materials, refer to the
instructions of the manufacturer of the relevant material. After
installation, check at least all flue gas outlet and air supply parts for
tightness.
Warning
If the flue gas outlet and air supply materials are not installed in
accordance with the instructions (e.g. not leak-proof, not correctly
bracketed), this can result in dangerous situations and/or physical
injury.
Make sure that the flue gas outlet pipe towards the boiler has a sufficient
gradient (at least 50 mm per metre) and that there is a sufficient
condensate collector and discharge (at least 1 m before the outlet of the
boiler). The bends used must be larger than 90° to guarantee the
gradient and a good seal on the lip rings.
130 mm
150 mm
(2)
22 m
44 m
8 m
24 m
53
+ L
A
B
100
110
130
mm
mm
mm
1.4 m
1.5 m
1.6 m
4.9 m
5.4 m
6.2 m
100
110
130
mm
mm
mm
-
-
1 m
-
-
1.8 m
4 Before installation
180 mm
(2)
60 m
60 m
150
180
200
mm
mm
mm
-
-
-
-
-
-
150
180
200
mm
mm
mm
1.2 m
1.4 m
1.6 m
2.1 m
2.5 m
2.8 m
19