Specific Safety Instructions; Additional Guidelines - REMEHA Quinta Ace Installation, User And Service Manual

Table of Contents

Advertisement

1.3

Specific safety instructions

7625116 - v.04 - 17012017
Caution
Make sure the boiler can be reached at all
times.
The boiler must be installed in a frost-free area.
If the power cord is permanently connected, you
must always install a main bipolar switch with
an opening gap of at least 3 mm (BS EN
60335-1).
Drain the boiler and central heating system if
you are not going to use your home for a long
time and there is a chance of frost.
The frost protection does not work if the boiler is
out of operation.
The boiler protection only protects the boiler,
not the system.
Check the water pressure in the system regular­
ly. If the water pressure is lower than 0.8 bar,
the system must be topped up (recommended
water pressure between 1.5 and 2 bar).
Important
Keep this document near to the boiler.
Important
Only remove the casing for maintenance and re­
pair operations. Refit all panels when mainte­
nance work and servicing are complete.
Important
Instruction and warning labels must never be re­
moved or covered and must be clearly legible
throughout the entire service life of the boiler.
Damaged or illegible instructions and warning
stickers must be replaced immediately.
Important
Modifications to the boiler require the written ap­
proval of Remeha.
1.3.1

Additional guidelines

In addition to the legal requirements and guidelines, the
supplementary guidelines in this manual must also be
followed. Supplements or subsequent regulations and
guidelines that are valid at the time of installation shall
apply to all regulations and guidelines specified in this
manual.
1 Safety
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents