Final Instructions; Saving The Commissioning Settings - REMEHA Gas 210 Ace 80 Installation And User Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 210 Ace 80:
Table of Contents

Advertisement

Values at low load for G31 (propane)
Gas 210 Ace 160
Gas 210 Ace 200
(1) Nominal value.
(2) Nominal value.
Fig.68
Adjusting screw B
B
B
7.3

Final instructions

Fig.69
Example filled-in sticker
Adjusted for / Réglée pour /
Ingesteld op / Eingestellt auf
/ Regolato per / Ajustado
para / Ρυθμισμένο για /
Nastawiony na / настроен
для / Reglat pentru /
настроен за / ayarlanmıştır /
Nastavljen za / beállítva/
Nastaveno pro / Asetettu
kaasulle / Justert for/
indstillet til/ ‫: ل طبض‬
G20
Gas
20
mbar
C
(10)3(X)
C
C
(11)3(X)
(13)3(X)
C
(12)3(X)
7.3.1

Saving the commissioning settings

7837114 - v.01 - 10012023
AD-3002451-01
Parameters / Paramètres /
Parameter / Parametri /
Parámetros / Παράμετροι /
Parametry / Параметры /
Parametrii / Параметри /
Parametreler / Paraméterek
/ Parametrit / Parametere /
Parametre / ‫: تاملعملا‬
DP003 - 3300
GP007 - 3300
GP008 - 2150
GP009 -
AD-3001124-02
O
(%)
(1)
2
4,1 – 4,9
(1)
4,1 – 4,9
(1)
4. If the measured value is outside of the values given in the table,
correct the gas/air ratio.
5. Use the adjustment screw B to set the percentage of O
gas type being used to the nominal value.
Increasing the gas flow, will decrease O
direction in which the adjusting screw must be turned to increase or
decrease the gas flow is indicated on the gas control valve.
The 3- to 4-section boilers are supplied with a different gas control
valve from the 5- to 6-section boilers.
See drawing for the position of adjusting screw B for low load.
6. Check the flame through the inspection glass. The flame must not
blow off.
7. Repeat the full load test and the low load test as often as necessary
until the correct values are obtained.
8. Set the boiler back to the normal operating status.
1. Remove the measuring equipment.
2. Screw the cap on to the flue gas measuring point.
3. Seal the gas valve unit.
4. Put the front casing back.
5. Heat up the central heating system to approximately 70°C.
6. Switch the boiler off.
7. Vent the central heating system after approx. 10 minutes.
8. Turn on the boiler.
9. Check the water pressure. If necessary, top up the central heating
system.
10. Fill in the following data on the sticker included, and attach it next to
the data plate on the appliance.
The gas type, if adapted to another gas;
The gas supply pressure;
The flue type, if set to overpressure application;
The parameters modified for the changes mentioned above;
Any fan speed parameters modified for other purposes.
11. Optimise the settings as required for the system and user
preferences.
See
For more information; Settings, page 44 and User instructions,
page 66.
12. Save the commissioning settings on the control panel, so they can be
restored after a reset.
13. Instruct the user in the operation of the system, boiler and controller.
14. Inform the user of the maintenance to be performed.
15. Hand over all manuals to the user.
You can save all current settings on the control panel. These settings can
be restored if necessary, for example after replacement of the control unit.
> Advanced Service Menu > Save as commissioning settings
7 Commissioning
CO
(%)
(2)
2
10,5
– 11,0
(2)
10,5
– 11,0
(2)
/CO
for the
2
2
and increase CO
. The
2
2
43