The Scb-02 Expansion Pcb - REMEHA Gas 210 Ace 80 Installation And User Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 210 Ace 80:
Table of Contents

Advertisement

5 Installation
5.6.5

The SCB-02 expansion PCB

Fig.46
SCB-02 PCB
N
N L
Fig.47
DHW pump connector
N L
32
Status A
N L
Nc
Nc
C No
The SCB-02 has the following features:
Control of a (mixing) zone for heating (or cooling)
Control of one domestic hot water (DHW) zone
0–10 V output connection for a PWM system pump
Two potential-free contacts for status notifications
Expansion PCBs are automatically recognised by the control unit of the
boiler. If expansion PCBs are removed, the boiler will show an error code.
To resolve this error, an auto-detect must be carried out after removal.
Connecting a domestic hot water (DHW) pump
Connecting a domestic hot water (DHW) pump. The maximum power
consumption is 300 VA.
Connect the pump as follows:
N Neutral
L Phase
AD-4000123-01
Connecting a mixing valve
The mixing valve connector can be used to connect a mixing valve (230
VAC) for use in a boiler group (zone).
Caution
If possible, use the pump modulation signal. This provides the
most accurate pump control.
If the automatic burner unit does not support pump modulation,
the pump will behave as an on/off pump.
Status B
C No
Earth
Tdhw Tflow
Tout
R-Bus
7837114 - v.01 - 10012023
0-10
0-10
-
-
+
+
AD-3001313-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 210 ace 120Gas 210 ace 160Gas 210 ace 200

Table of Contents