Commissioning
______________________________________________________________________________

Commissioning Checklist

Controller Mounted on suitable flat heatsink with appropriate heatsink compound?
Power wiring checked, shortest routes taken where possible?
Light wiring checked; use calibrator to verify controller correct switch operation.
Accelerator set-up and checked 0 – 100%?
Personalities are all set, checked and record filled out?
MillipaK 4QPM Controller Manual
Page 64
Checklist