Device Management; Check The Port Load; Diagnostics; Power-On Self-Test - NovaStar CX40 Pro User Manual

Led display controller
Table of Contents

Advertisement

7

Device Management

7.1 Check the Port Load

On the main menu screen, choose Screen Settings > Load.
Figure 7-1 Port load
Check the current load status of each Ethernet port of the device.

7.2 Diagnostics

7.2.1 Power-on Self-Test

When the device is powered on, a self-test is performed automatically.
Startup OK: You can start using the full functionality of the CX40 Pro.
Startup error: The following error information is displayed. If you select Close, you will use the device in the
function restricted state. If you select Export, you can obtain the power-on self-test (POST) result.
Figure 7-2 POST - Error

7.2.2 Maintenance Self-Test

When the device has a fault, perform self-test manually, check and export the result.
On the main menu screen, select Maintain.
www.novastar.tech
CX40 Pro LED Display Controller User Manual
29

Advertisement

Table of Contents
loading

Table of Contents