Figure 112
1. Hose plug
2. Hose clamp
3.
Remove the hose plug from the suction hose
and assemble the hose onto the barbed fitting of
the hydraulic pump
4.
Secure the hose to the fitting with the hose
clamp
(Figure
112).
3. Suction hose
4. Barbed fitting (hydraulic
pump)
(Figure
112).
19
Installing the Forward
Pressure Hose for the
Boom-Lift Manifold
Parts needed for this procedure:
1
Forward pressure hose 10 x 660 mm (3/8 x 26 inches)
Procedure
1.
Loosely assemble the straight fitting of the
forward pressure hose to the bulkhead fitting
(Figure
113).
g313948
1. Back of the machine
2. Bulkhead fitting
2.
Route the hose to the hydraulic pump
114).
46
Figure 113
3. Straight fitting (forward
pressure hose)
g314259
(Figure